Tuesday 3 December 2013

Quick note, before a bigger event.

Oops.
Forgot to post these pictures.




This was a week or so ago when they poured the foundation footings.

Mr. cement truck arrived, and since the driveway is still pretty rough the truck wasn't able to climb. So how to get the cement up there?




Well, let the backhoe carry it up.



Look inside the bucket. A lovely mix of cement coming right up!


Don't spill any, please.











There is Alex, our contractor, supervising the action.


Wayne, the backhoe operator was great. He delivered every load safely up the drive.









What a great eye. Every pour went straight into the forms.







Tune-in soon. The first floor slab is being poured tomorrow. The cement trucks (at least 4, maybe more) show up at 8AM. I'll be there with my trusty camera!

No comments:

Post a Comment